Wednesday, December 24, 2008
Wednesday, December 17, 2008
Wednesday, December 10, 2008
Wednesday, December 3, 2008
Tuesday, November 18, 2008
Air Baffles
all of these wind baffles to prevent wind washing of the insulation.
Wednesday, November 12, 2008
Friday, October 31, 2008
Friday, October 24, 2008
Tuesday, October 14, 2008
Friday, October 3, 2008
Wednesday, October 1, 2008
Indoor Air Quality
construction so no debris or contaminates can degrade the performance
of our air handling system.
Sunday, September 28, 2008
Wednesday, September 24, 2008
Cedar Breather
escape, we've eliminated the need for furring strips which means less
waste and less lumber usage.
Friday, September 19, 2008
Friday, September 12, 2008
Wednesday, September 10, 2008
Friday, September 5, 2008
Friday, August 29, 2008
Some View
had direct views to the outside andvfor natural sunlight to reach 100%
of all commonly occupied spaces.
Tuesday, August 26, 2008
Saturday, August 23, 2008
Wednesday, August 20, 2008
Tuesday, August 19, 2008
Monday, August 18, 2008
The Shape of Things
This week we start putting shingles on Buiding A and then Building C. We are also building the roof structure on Building B.
Saturday, August 9, 2008
Beautiful Roofs
The sheathing is done on Building A (all with FSC Certified Plywood) and we're getting ready to start sheathing building C. At the same time we'll start installing the natural cedar shingles, which eliminate any heat island effect the roof might have.
Highway Work is Done
As part of the project we were required by the town to widen the highway and access street, as well as putting in turn lanes and crosswalks. That work was completed yesterday, all that's left is for the line striper to come on Monday and paint the white lines...
Tuesday, July 22, 2008
Roof Sheathing
The roofs are starting to get covered and all of the plywood sheathing is FSC certified, relevant to MR 7 Certified Wood.
Wednesday, July 9, 2008
Monday, July 7, 2008
Highway Work
As part of this project, we are widening the street that access our property and installing turn lanes to handle the extra traffic flow. That work begins today...