Saturday, March 15, 2008

Asphalt Reuse

LEED NC MR 3.1-3.2 Materials Reuse requires that a portion of construction materials be of reused content. Here you can see the beginning of a pile of crushed asphalt taken up from the existing parking lot. It will be ground up and used as a permeable substrate for the crushed pea stone surface of the new parking lot, which will be lined with the Belgian block seen in the background, also a reclaimed material as posted earlier.

No comments: